Throgs Neck Bridge - Replacement of Deck in the Suspended Spans

This project involved the replacement of the 60-year-old grid deck in the suspended spans, towers, and anchorages of the bridge. Joint leakage, out-of-plane bending, and fatigue led to cracking in the stringers, which must be replaced along with the deck. Two options, an orthotropic deck and a continuous “floating” grid deck, were proposed as the most cost effective solutions, and the orthotropic deck was selected as the option for final design. A wind evaluation, including extensive wind tunnel testing, was undertaken to ensure that the structure would remain stable after the new deck system was installed.

​

The project also included the replacement of finger joints, installation of a new fire standpipe, new roadway lighting, and an evaluation of the suspenders.

​

CHI performed construction support services on this project, and the work included:

  • Responses to RFIs during deck fabrication.

  • Shop drawing reviews.

  • Staged construction analysis.

  • Final design drawings for the main cable inspection and suspender replacement.

​

LOCATION

Bronx, NY

​

OWNER     

Tri-borough Bridge & Tunnel Authority (TBTA)